Timeline of Kasetsart University
Event on February 07, 2003
Water Filter Building and Campus Tower
Water Filter Building and Campus Tower was the campus water supply source. The total construction budget was 26,900,000.00 Baht. The construction was started on February 4, 2003 and completed on April 28, 2004. It produced a water supply of 20,000 cubic meters per day for serving 20,000 people in the area. The Royal Irrigation Department had built a drainage canal from the R16L canal and sent it to the Sakon Nakhon basin to pump water to be used in the water supply system. The water filter building consisted of a pumping station, water purification and disinfection plant, clear water tank, and 59 meters high tank to increase the pressure to supply the area of 4,000 Rai of the campus. This tall tank had been converted into a campus tower that can see the scenery of the campus.